• Welcome to For E Bodies Only !

    We are a community of Plymouth Cuda and Dodge Challenger owners. Join now! Its Free!

Proper hole size in sheet metal for spot welding?

340challconvert

Well-Known Member
Joined
Feb 13, 2011
Messages
5,191
Reaction score
2,732
Location
Parsippany, NJ
Getting ready to drill the holes in the trunk floor to be spot welded to the frame rails.
I could spot eye it; what size drill bit for this task?
Thanks
Dino2 (1).gif
 

gzig5

Well-Known Member
Joined
May 10, 2018
Messages
393
Reaction score
131
Location
Mequon, WI
Somewhere between 1/4"-5/16" should work. I think the pneumatic flange/punch tool I have does 5/16".
 

aussiemark

Well-Known Member
Joined
Nov 29, 2014
Messages
1,197
Reaction score
322
Location
Perth Western Australia
I found if the hole is too small you don't get enough penetration into the frame rail and as it's cooling it will release. Get the 2 pieces as close together as possible with clamps, vice grips, sheet metal screws or even dent it if you have to. Cut the mig wire flush with the nozzle every time before you start, I like to start the weld on the frame rail in the centre of the hole then move out and join the new panel to it.
 

Adam

Well-Known Member
Joined
Dec 25, 2012
Messages
1,644
Reaction score
697
Location
Washington
I agree with at least a 1/4 inch. Any smaller and the arc can hit the side of the hole, resulting in poor penetration. I also like to have about 3/8 of mig wire sticking out so I can see exactly where it is...

Tip: lay the trunk pan in place and mark the edges of the frame rails from the bottom, with a sharpie or something. Then pull the pan back out and drill the holes in the pan from the bottom. This way you will not miss the frame rails, and the holes will not have any burrs keeping the pan from laying flat. Don’t forget the gas tank supports. Good luck!
 
Last edited:

quapman

Well-Known Member
Joined
Dec 28, 2008
Messages
878
Reaction score
225
I just did a bunch and had good luck with 5/16" I use a #4 center drill.
 

budascuda

Well-Known Member
Joined
Jun 17, 2017
Messages
1,106
Reaction score
569
340, count the factory spot welds.
You need as many stud welds as factory and preferably in or very near the same place as factory welds. (for proper collapse and crumpling of the structure in case of an impact), God forbid!
5/16 hole is my call.

Also, I don't usually give this tip to anybody, but for you....
Since the duration of welding a stud weld is mere second(s), the workpiece may not be ready to accept a sudden and huge temperature change to produce a weld puddle that can melt all 3 pcs. involved in the weld, therefore producing a week and brittle fusing between the mig wire and its surrounding area. In the cases where a good fusing is required but the work piece or the ambient temperature is too low (its cold outside) it is recommended to slightly warm up the work piece,
(a propane torch is more than enough, even a heat gun)Just so the surface of the metal is not cold to the touch.
In a sheetmetal application, you don't want so much heat that it would distort the metal, just slightly warm to the touch not HOT.
You'll be amazed how something so little could make such a difference.
Also, the area of the weld has to look shiny,
that is clean!

Good luck
 

WayTooShort

Active Member
Joined
Dec 29, 2018
Messages
31
Reaction score
38
Very useful info, I will be needing it soon too. Thank all of you very much.
 
Back
Top