• Welcome to For E Bodies Only !

    We are a community of Plymouth Cuda and Dodge Challenger owners. Join now! Its Free!

4 speed install

topmill

Member
Joined
May 30, 2014
Messages
24
Reaction score
0
Location
San Diego
anyone have pics of where they cut the floor to weld in the 4 speed section? Other guys say just lay it down and cut in 2" that way you have room for error. Still would like to see where to cut. Do I butt weld or overlap, tack weld with seam sealer?
 

Adam

Well-Known Member
Joined
Dec 25, 2012
Messages
1,648
Reaction score
706
Location
Washington
Where the new tunnel has a flange you should drill holes and tack it in, if there are areas you can butt weld that is good too. The problem with leaving 2 in. for error is that 1 1-1/4 excess metal will protrude into the trans tunnel underneath. That may interfere with the trans, you may cut yourself on it later, the bare edge will collect dirt, invite rust, ect.. just measure 2-3 times and cut once. You can also peen up the edge underneath and spray it with an undercoating. Use a "Paintable" undercoating as it will get hard, the other stuff never does and is too soft, IMO.
 
Back
Top