Juan Veldez
Well-Known Member
I just wanted to post my extreme frustration with Scat Enterprises. I ordered a rotating assembly on August 6th. I was told 4-6 weeks for delivery. They take 50% of the cost up front. On the 6th week I called and was told they were waiting on the pistons, everything else was there. Three weeks after that I called again and was told they were waiting on the main bearings, everything else was there. I called today and was told everything is there except the connecting rods. In addition, half of the other calls I made and left a message were never returned. Not sure if I am an exception to the norm, but at this point I would recommend anyone here using some other supplier.